Heron Power careers: official careers page and open jobs
37 open · from Heron Power’s own careers site
Official careers page: heronpower.com/careers
Open now
1–37 of 37
| Role | Company | Location | Pay a year | Experience | Posted | Quick look |
|---|---|---|---|---|---|---|
| Senior/Staff Mechanical Engineer, Power ElectronicsSenior | Heron Power | Scotts Valley On-site | – | 4+ yrs | ||
Senior/Staff Mechanical Engineer, Power Electronics at Heron Power Mechanical design of medium-voltage power converter parts and assemblies
Transformers | ||||||
| Senior Technical Account ManagerSenior | Heron Power | Scotts Valley On-site | – | 1–3 yrs | ||
Senior Technical Account Manager at Heron Power Sales engineering and technical account management for grid power converter systems
TransformersExcel | ||||||
| Hardware Applications EngineerEntry level | Heron Power | Scotts Valley On-site | – | 1+ yrs | ||
Hardware Applications Engineer at Heron Power Application testing and lab bring-up of solid state transformer for grid and data center power conversion
Python | ||||||
| Senior/Staff Electronics Design EngineerSenior | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Senior/Staff Electronics Design Engineer at Heron Power Low voltage electrical system design for power converters
Compliance | ||||||
| Power Electronics Test & Validation EngineerSenior | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Power Electronics Test & Validation Engineer at Heron Power Power electronics application test and validation for solid state transformer and battery systems
Python | ||||||
| Systems Integration Engineer, SST & Bess Applications | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Systems Integration Engineer, SST & Bess Applications at Heron Power Application testing and integration of solid state transformer and battery storage systems at lab and pilot sites
Python | ||||||
| Product Test Engineer, Energy Storage Applications | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Product Test Engineer, Energy Storage Applications at Heron Power Application-specific test engineering for solid state transformers and battery energy storage systems
PythonTransformers | ||||||
| Intern, Power Electronics Controls Engineer (Spring /Summer 2027)Intern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Power Electronics Controls Engineer (Spring /Summer 2027) at Heron Power Power electronics controls engineering internship (dynamic modeling, controller design, HiL validation)
SpringEmbeddedCompliance | ||||||
| Senior Sales EngineerSenior | Heron Power | Scotts Valley On-site | – | 1–3 yrs | ||
Senior Sales Engineer at Heron Power Sales engineer for grid power electronics: technical lead with customers, site designs and proposals
TransformersExcel | ||||||
| Intern, Graphic DesignIntern, internship | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Graphic Design at Heron Power Graphic design internship for brand identity, signage, apparel and print
Figma | ||||||
| Senior/Staff Manufacturing EngineerSenior | Heron Power | Scotts Valley On-site | – | 7+ yrs | ||
Senior/Staff Manufacturing Engineer at Heron Power Manufacturing process and test engineering for high-volume transformer assembly lines
| ||||||
| Senior/Staff Software Engineer, Connected SystemsSenior | Heron Power | Scotts Valley On-site | – | 7+ yrs | ||
Senior/Staff Software Engineer, Connected Systems at Heron Power Backend engineer building telemetry and fleet management software for grid-connected power converters
EmbeddedKafkaPythonGoRustJava | ||||||
| Test Engineer – Power Electronics | Heron Power | Scotts Valley On-site | – | – | ||
Test Engineer – Power Electronics at Heron Power Automated hardware test infrastructure for power electronics converters
Python | ||||||
| Electrical Engineer - Manufacturing TestEntry level | Heron Power | Scotts Valley On-site | – | – | ||
Electrical Engineer - Manufacturing Test at Heron Power Electrical test fixtures and production test development for power electronics hardware
| ||||||
| Senior/Staff Mechanical Engineer, Industrial EnclosuresSenior | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Senior/Staff Mechanical Engineer, Industrial Enclosures at Heron Power Design of outdoor industrial enclosures for power converters
| ||||||
| Senior/Staff Power Electronics EngineerSenior | Heron Power | Scotts Valley On-site | – | 3+ yrs | ||
Senior/Staff Power Electronics Engineer at Heron Power Design and deliver grid-connected power converter hardware
Compliance | ||||||
| Electronics Design Engineer | Heron Power | Scotts Valley On-site | – | 2+ yrs | ||
Electronics Design Engineer at Heron Power Low voltage electrical system design for power converters
Compliance | ||||||
| Intern, Mechanical Engineer (Spring/Summer 2027)Intern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Mechanical Engineer (Spring/Summer 2027) at Heron Power Mechanical design intern for power converter hardware
SpringTransformers | ||||||
| Staff/Senior Staff Supplier Industrialization EngineerLead / Manager | Heron Power | Scotts Valley On-site | – | 5–7 yrs | ||
Staff/Senior Staff Supplier Industrialization Engineer at Heron Power Supplier industrialization and supplier quality engineering for power electronics hardware
Supply chain | ||||||
| Intern, Electrical Engineering (Compliance) - Spring 2027Intern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Electrical Engineering (Compliance) - Spring 2027 at Heron Power EMC and product safety compliance engineering internship for power converters
PythonSpringCompliance | ||||||
| Staff/Senior Staff Global Supply ManagerSenior | Heron Power | Scotts Valley On-site | – | 8+ yrs | ||
Staff/Senior Staff Global Supply Manager at Heron Power Global strategic sourcing and supply management for power electronics components and assemblies
Supply chainProcurementLogisticsTableau | ||||||
| Intern, Power Electronics Engineer, Spring/Summer 2027Intern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Power Electronics Engineer, Spring/Summer 2027 at Heron Power Power electronics hardware design internship for medium-voltage grid converters
Spring | ||||||
| Staff Engineering Program ManagerLead / Manager | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Staff Engineering Program Manager at Heron Power Engineering program management for power electronics converter product launch
Supply chainEmbeddedCompliance | ||||||
| Hardware Validation Systems Developer | Heron Power | Scotts Valley On-site | – | – | ||
Hardware Validation Systems Developer at Heron Power Build automated hardware test systems and fixtures for power converters
Python | ||||||
| Electrical / Electronics Design Engineer - Pcba Test Automation | Heron Power | Scotts Valley On-site | – | – | ||
Electrical / Electronics Design Engineer - Pcba Test Automation at Heron Power Build automated hardware test systems for power converter PCBAs and high-power systems
| ||||||
| Intern, System Integration & Test Automation (Spring 2027)Intern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, System Integration & Test Automation (Spring 2027) at Heron Power Hardware test engineering internship building test benches and automation for grid power converters
SpringPython | ||||||
| Intern, Medium Voltage Test EngineeringIntern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Medium Voltage Test Engineering at Heron Power Medium-voltage insulation test engineering intern
Python | ||||||
| Technical Program Manager - Power ElectronicsLead / Manager | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Technical Program Manager - Power Electronics at Heron Power Technical program management for power electronics converter product launch
Supply chainEmbeddedCompliance | ||||||
| Staff/Senior Staff Supplier Industrialization Engineer - MechanicalSenior | Heron Power | Scotts Valley On-site | – | 8+ yrs | ||
Staff/Senior Staff Supplier Industrialization Engineer - Mechanical at Heron Power Mechanical supplier industrialization engineering, supplier qualification and DFM for power electronics hardware
Supply chain | ||||||
| Staff/Senior Staff Supplier Industrialization Engineer - PcbaLead / Manager | Heron Power | Scotts Valley On-site | – | 8+ yrs | ||
Staff/Senior Staff Supplier Industrialization Engineer - Pcba at Heron Power Supplier industrialization engineer for PCBA manufacturing
Supply chain | ||||||
| Staff/Senior Staff Software EngineerLead / Manager | Heron Power | Scotts Valley On-site | – | 10+ yrs | ||
Staff/Senior Staff Software Engineer at Heron Power Staff software engineer building factory, supply chain and cloud infrastructure systems for power electronics
AWSKubernetesTerraformSupply chainPython | ||||||
| Senior/Staff Hardware Applications EngineerSenior | Heron Power | Scotts Valley On-site | – | 5+ yrs | ||
Senior/Staff Hardware Applications Engineer at Heron Power Hardware application testing and validation of solid state transformer for power electronics
Python | ||||||
| Intern, Business Development Associate, Fall 2026/Winter 2027Intern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Business Development Associate, Fall 2026/Winter 2027 at Heron Power Business development research and sales support for energy hardware company
Excel | ||||||
| Intern, Automation Controls Engineer (Spring 2027)Intern | Heron Power | Scotts Valley On-site | – | – | ||
Intern, Automation Controls Engineer (Spring 2027) at Heron Power Controls and automation equipment wiring, fabrication, and documentation internship on a pilot production line
SpringExcelPLC | ||||||
| Accounting Manager/Senior Accounting ManagerLead / Manager | Heron Power | Scotts Valley On-site | – | 7+ yrs | ||
Accounting Manager/Senior Accounting Manager at Heron Power Accounting manager overseeing AP, accruals, payroll, AR, fixed assets and general ledger close
AccountingPayroll | ||||||
| Software Engineer/Senior Software EngineerSenior | Heron Power | Scotts Valley On-site | – | 2–5 yrs | ||
Software Engineer/Senior Software Engineer at Heron Power Backend and internal software engineering for a power electronics factory and supply chain
PythonJavaScriptTypeScriptAWSKubernetesSupply chain | ||||||
| Staff Industrial DesignerLead / Manager | Heron Power | Scotts Valley On-site | – | – | ||
Staff Industrial Designer at Heron Power Industrial design of power electronics products, product UX, and brand visual communication
UX | ||||||
Get new Heron Power jobs the day they’re posted
- We watch 108,000+ company career pages, more than any job site.
- New jobs in your field reach your inbox at 8 am and 6 pm, usually within hours of being posted.
- You can apply on day 1, straight on the employer’s own site.
Paid once, no auto-renew · You’ll see your jobs before paying
Share this list: LinkedIn · X · WhatsApp
Questions
- Is Heron Power hiring right now?
- Yes: 37 Heron Power jobs are open on its own careers site today, in places such as Scotts Valley.
- Where is Heron Power’s official careers page?
- Heron Power’s jobs are posted on https://heronpower.com/careers. Every job on this page links to its listing there.
- What roles is Heron Power hiring for?
- Most of Heron Power’s open jobs are Electrical / Electronics Engineer (11), Manufacturing / Industrial Engineer (4), Mechanical Engineer (3), Intern / Trainee (3), Program / Project Manager (2), counted from its own careers site.
- Where is Heron Power hiring?
- Heron Power has open jobs in Scotts Valley (37).
- Which site alerts me to new Heron Power jobs?
- OpeningsFirst emails new Heron Power jobs the day employers post them on their own career pages, checking 108,296 career sites. Many never reach LinkedIn. Listings older than 5 days are free to browse here; 37 are open on this page now.
- How do I hear about new Heron Power jobs first?
- Members get new matching jobs by email at 8 am and 6 pm, within hours of being posted, so they apply among the first. It costs $9 a month.