Deputy Manager - Mechanical (BOP/ Station Piping)
Adani Group · adani.com
SingrauliLead / Manager7+ yrs
The job in short
Balance of plant and station piping engineering.
Procurement
Details
- Found
- 21 d ago · posted 2026-09-23
- Location as listed
- Singrauli, Madhya Pradesh, India
- Role
- Mechanical Engineer
- Source
- The company’s own careers site
Full description
Mechanical BOP Project Execution
• Execute and monitor installation and commissioning activities of Mechanical BOP systems in thermal power projects.
• Coordinate project execution activities related to CW system, ACW system, Fire Fighting System, DM Water System, Service Water System, Air Compressors, Fuel Oil System, and other auxiliary systems.
• Ensure compliance with project schedules and construction milestones.
• Track erection progress and identify bottlenecks affecting project completion.
Station Piping Execution
• Supervise fabrication, erection, hydro testing, flushing, and commissioning of station piping systems.
• Monitor piping installation activities as per approved drawings, specifications, and quality standards.
• Ensure proper execution of steam, condensate, cooling water, service water, fire water, compressed air, and auxiliary piping networks.
• Review piping layouts, isometrics, support drawings, and material specifications.
Engineering & Technical Coordination
• Review engineering drawings, technical specifications, and project documents.
• Coordinate with design consultants, EPC contractors, and OEMs for technical clarifications.
• Resolve site engineering issues and ensure timely implementation of design changes.
• Participate in constructability reviews and engineering discussions.
Contractor & Vendor Management
• Supervise contractors and monitor productivity, quality, and safety compliance.
• Coordinate manpower, machinery, and resources required for project execution.
• Verify work completion and support certification of contractor bills.
• Ensure timely availability of materials and equipment at site.
Commissioning & Project Handover
• Coordinate pre-commissioning and commissioning activities of Mechanical BOP systems.
• Support system readiness checks, hydro tests, flushing activities, trial runs, and performance testing.
• Ensure timely closure of punch points and commissioning observations.
• Facilitate smooth system handover to Operations and Maintenance teams.
Project Planning & Monitoring
• Monitor project schedules, resource allocation, and execution progress.
• Prepare daily, weekly, and monthly progress reports.
• Identify project risks and implement mitigation measures.
• Coordinate with Civil, Electrical, C&I, Procurement, and Planning teams to achieve project objectives.
Quality, Safety & Compliance
• Ensure adherence to quality standards, project specifications, and inspection requirements.
• Enforce compliance with HSE guidelines, permit-to-work systems, and statutory regulations.
• Participate in safety audits, quality inspections, and project reviews.
• Promote a zero-incident safety culture across project execution activities.
• Minimum 7 years of experience in execution of Mechanical BOP and Station Piping projects for Thermal Power Plants.
• Hands-on experience in erection, testing, commissioning, and project management of utility piping systems and auxiliary plant equipment.
• Exposure to supercritical and ultra-supercritical power projects will be preferred.
• Experience in coordinating with EPC contractors, OEMs, consultants, and construction agencies.
• Experience in greenfield thermal power project execution will be an added advantage.