MGR (MATLS-Proprietary V Quality)
Bajaj Auto · bajajauto.com
Pipariya ShahnaiOn-siteLead / Manager8–10 yrs
The job in short
Automotive proprietary parts quality manager (supplier quality, PPAP-style checks, root cause on field failures).
Details
- Found
- 14 d ago · posted 2026-09-24
- Location as listed
- Pipariya Shahnai, India, Maha, In
- Role
- Engineer (other)
- Source
- The company’s own careers site
Full description
Division
BAL Akurdi
Department
Materials
Level / Grade
L3 (EX)
Functional Area
Proprietary
1
Job Title
MGR (MATLS QLTY – PROPRIETARY)
2
Reporting
Functional reporting to : MANOHAR S SAMAGA
3
Background
i) Educational Qualification
• Filling a position vacated recently in Materials Proprietary Parts Quality section
Desirable: B.E. (Mechanical) , (Production)
ii) Experience
Minimum: 8
Maximum: 10
iii) Age Limit
Minimum: 30
Maximum: 35
4
Job Role & Responsibilities
Applicable parts :
• Clutch Assembly
• Engine Piston Assembly
• Engine Valves
• Engine Valve Guides, Valve Seats (Sintered & Machined)
• Engine Chain Tensioners
• Engine Oil Pumps
• Exhaust Catalyst
• EGR Valve/ Oil Cooler
• Petrol Tank Caps
• Ignition Lock, Seat Lock
• Anti-roll bar
• Bearings – Ball, Needle, Bimetal
• Window regulators
New Models :
• Run at rate for parts , NC/Improvement points listing, confirmation of corrective actions - CTQ (Critical To Quality) & CTP (Critical To Process). Confirmation of application of Best Practices/ PRBFM (Process Review Based on Failure Modes).
• Checking of DR documents / Product test reports /Control Plans/ Inspection Agreements & PDIRs / Checking of 18 IATF documents.
• Follow up of dimensional deviations & actions for regularization of tolerances with R&D after process establishment .
• Application of ZDM (Zero Defects Methodology) based on CTQs leading to Engineering Fail-safing of process controls & Inspection controls at Assembly, Subassembly & Child parts based on process capability study.
Post productionization:
• Planned audits of IPO (Input-Process-Output) / Control Plan of recently developed parts.
• Monitoring & reduction of monthly QSR & IHR of vendors.
• Confirmation of HD of PRBFM points.
• Preparation of Best Practices list in addition to PRBFM points.
• Initiation of de-skilling projects.
• Actions on ‘Weak Vendors’
EFR/Warranty :
• Understand each EFR/spike in FFR.
• Study root cause with vendor team & BAL CFT team.
• Identify the process robustness improvement points.
• Incorporate them into IPO Audits or Process audits to confirm sustenance.
Desirable skills
• Knowledge of TPM application : JH(Jisu Hozen), PM (Preventive Maintenance), Layered audits, KK (Kobetsu Kaizen), Lean manufacturing, Industrial Engineering.
• Good exposure to MS Office tools .
• Practical applications of SPC (Process study method, Histogram preparation, evaluation of 6 Sigma, Cp & Cpk), Fall Tree / Ishikawa/ Fish Bone diagrams for analysis, DOE (Design of Experiments), KT analysis (Kepner Trego).